141 R 568 Boiler Work
WRC crews have spent a great deal of time in Switzerland working on 141 R 568. During the late 2009 inaugural runs the 568 encountered a few problems. WRC is working to repair such items as the feed water heater system, minor boiler repairs and more. We expect 568 be back out and running for early fall and possible mid summer excursions behind the William Cook Rail Swiss Classic Train. You can see the train and read it’s history here at the Swiss Classic Train web page.